Infiltration Testing (LID)

In-situ infiltration testing used to size low impact development stormwater features.

Estimate your study cost

Infiltration testing (LID) options

Infiltration testing measures how fast water soaks into the native soil where a low impact development (LID) feature will be built: a bioretention cell, infiltration trench, soakaway or permeable pavement base. The result, reduced by a safety factor, becomes the design infiltration rate that sizes the feature. In Ontario it is commonly needed to support a water balance or stormwater management plan. Testing and interpretation are completed by a licensed hydrogeologist (P.Geo.) or professional engineer (P.Eng.).

Why reviewers want measured rates

Reviewers want a measured infiltration rate because LID features only work if the ground accepts water at the rate the design assumes, and layering, compaction or a shallow water table can cut that rate sharply.

LID features only work if the ground below them accepts water at the rate the design assumes. Soil maps and textbook values are a starting point, but layering, compaction and a shallow water table can cut the real rate sharply. The LID Stormwater Management Guide published by the Sustainable Technologies Evaluation Program (a partnership of Toronto and Region, Credit Valley and Lake Simcoe Region conservation authorities) bases design rates on on-site testing.

Conservation authorities also tie testing to water balance reviews. The Lake Simcoe Region Conservation Authority requires seasonal high groundwater levels and in-situ infiltration rates whenever LID features are proposed to mitigate a water balance deficit.

Test methods

Infiltration testing uses four main methods, the borehole permeameter, the test pit percolation test, the double ring infiltrometer and grain size analysis, and the LID Stormwater Management Guide gives on-site permeameter and percolation tests the most weight.

MethodWhere it fits
Borehole permeameter (for example, Guelph permeameter)Measuring field-saturated hydraulic conductivity at the design depth in boreholes
Percolation test in a test pitShallow features where the base is reachable by excavator
Double ring infiltrometerSurface or near-surface testing for permeable pavement and shallow cells
Grain size analysisSupporting estimate and comparison between locations

The guide treats permeameter and percolation tests on site as stronger evidence than double ring tests or grain size analysis, which is reflected in the safety factor.

From measured rate to design rate

The design infiltration rate is the measured rate divided by a safety correction factor between 2 and 3, with factors closer to 3 for larger catchments, weaker test methods, clayey soil, changing layers below the base or nearby septic systems and foundations.

The measured rate is divided by a safety correction factor between 2 and 3. Factors closer to 3 apply when:

  • the catchment draining to the feature is larger than 100 m²;
  • the rate comes from a double ring test or grain size analysis;
  • the soil is clayey;
  • geology, texture or density changes within 1.5 m below the feature's base; or
  • septic systems or building foundations are close by.
Site water balance before and after development Two panels. Before development, precipitation on a pervious site splits into evapotranspiration, small surface runoff and large infiltration to groundwater. After development, roofs and pavement increase runoff and reduce infiltration, and an LID infiltration feature returns part of the runoff to the ground. Before development After development Precipitation Evapotranspiration Runoff (small) Infiltration (large) Runoff (large) LID infiltration Infiltration deficit offset by LID Groundwater recharge
A water balance compares how precipitation divides into evapotranspiration, runoff and infiltration before and after development, and sizes measures to close any infiltration deficit.

Site water balance before and after development

Scroll sideways to see the whole diagram, or turn your phone for a wider view.

The field day, and what comes before it

Before testing, the site is mapped: surficial geology, watercourses and wetlands, slopes and drainage, wells and septic systems, and the preliminary grading plan with areas of cut and fill. Test locations then follow the proposed features.

  1. Test pits or boreholes at each proposed feature, logged by the hydrogeologist.
  2. Tests at the base elevation and through the profile below it.
  3. Monitoring wells, where needed, to establish the seasonal high water table.
  4. Report with measured rates, design rates and the separation to groundwater at each location.

Do the LID features need a ministry permission?

LID features sometimes need a ministry permission: away from a single lot used for residential purposes, storm water management works generally need an Environmental Compliance Approval or an EASR registration unless another exemption applies.

Sometimes, and it affects how the testing is reported. The ministry's sewage and storm water permissions page treats storm water green infrastructure and low impact development (rain gardens, permeable pavement, green roofs, rainwater harvesting and similar works) as storm water management works. Such works may not need an environmental permission when they are on one lot used for residential purposes, with all buildings residential. Otherwise, storm water management works generally need an Environmental Compliance Approval or an EASR registration for storm water management works, unless another exemption applies.

Where an approval is needed, the infiltration rates, the separation to groundwater and the test locations become part of the design record that supports it, so the testing report should state them feature by feature rather than as a site average.

Timing

Infiltration testing timing is set by frozen ground, which rules out meaningful tests until thaw, and by any requirement for seasonal high groundwater data, so the tests belong before the stormwater design is finalized.

The testing itself is usually a short field program once access and locates are arranged, followed by the report. Two things set the calendar: frozen ground, which rules out meaningful testing until thaw, and any requirement for seasonal high groundwater data, which means monitoring wells read over the period the reviewing agency specifies. Schedule testing before the stormwater design is finalized, so features can be moved if a location fails.

Infiltration testing cost

The cost of infiltration testing depends mostly on the number of feature locations and whether boreholes already exist, with deep bases or seasonal groundwater monitoring pushing it higher.

Indicative ranges based on typical scopes: Infiltration testing (LID)
AnswerIndicative range
Starting point (2 to 4, Use existing boreholes)$2,500 – $4,000
Test locations
2 to 4 (starting point) $2,500 – $4,000
5 to 8 $4,000 – $6,500
9 or more $6,000 – $9,500
Boreholes
Use existing boreholes (starting point) $2,500 – $4,000
New boreholes needed $4,000 – $6,000
Full span across all answers$2,500 – $14,500

Each row changes one answer and leaves the others at the starting point. Indicative ranges, rounded to the nearest $500. They exclude well drilling, government application fees and HST. Final scope is confirmed by the hydrogeologist after reviewing your site.

Reusing existing boreholes, or combining the work with geotechnical drilling, keeps the cost down. Many feature locations, deep bases, or a need for seasonal groundwater monitoring push it up.

What to have ready

Before the tests are booked, have the site plan with LID feature locations and base elevations, the grading plan, earlier borehole logs and the water balance or stormwater targets the features must meet.

  • The site plan with proposed LID feature locations and base elevations
  • The grading plan, if available
  • Borehole logs from earlier investigations
  • The water balance or stormwater targets the features must meet

What goes wrong

Infiltration tests go wrong most often when they are run in fill or topsoil, at a base elevation the grading plan has since changed, without groundwater data, or only once across a large feature.

  • Testing in fill or topsoil instead of the native soil the feature will sit on.
  • Testing at the wrong depth after the grading plan changed the base elevation.
  • No groundwater data, so the reviewer cannot confirm the feature stays above the water table.
  • Single test for a large feature, missing variability across its footprint.

Worked cost examples

Each example runs the estimator's own calculation on a realistic set of answers.

  • A few soakaways on a small site, existing boreholes$2,500 – $4,000

    Test locations: 2 to 4 · Boreholes: Use existing boreholes

    Testing in boreholes already drilled for the geotechnical work, at the planned base elevations. The cheapest case.

  • Subdivision with five to eight LID features, new boreholes$6,000 – $9,500

    Test locations: 5 to 8 · Boreholes: New boreholes needed

    Both answers multiply: more test locations, each needing its own borehole or test pit at the right depth.

  • Large site with nine or more features, new boreholes$9,000 – $14,500

    Test locations: 9 or more · Boreholes: New boreholes needed

    The top of the range. Seasonal groundwater monitoring under the features, if required, adds to this.

What the reviewer checks

A reviewer of an infiltration testing report checks that each test sits in native soil at the feature base, that the method and safety factor are justified, and that each base stays above the seasonal high water table.

  • Tests in native soil at each feature's base elevation, not in fill or topsoil
  • Conditions within 1.5 m below the base, where a tighter layer would control drainage
  • The test method, and why it suits the soil and depth
  • The safety correction factor chosen, with the reasons for it
  • Separation between each feature's base and the seasonal high water table
  • Test locations that match the current site and grading plans
  • Logs for every test pit or borehole

Infiltration testing or water balance?

Infiltration testing measures how fast the ground takes water at each LID feature, while a water balance assessment calculates the annual infiltration deficit for the whole site that the features must make up.

AspectInfiltration testingWater balance assessment
ProducesMeasured and design infiltration rates at each featureAnnual infiltration deficit for the whole site
MainlyField workCalculation
Used forSizing each LID feature so it drainsDeciding how much infiltration the LID features must provide
TogetherThe water balance sets the target; testing shows where and how fast the ground can take it

Where this study is commonly required

Location pages with local requirements, groundwater data and the agencies involved, by region:

Greater Toronto and Hamilton Area

Infiltration testing questions

Why is the measured rate divided by a safety factor?

Field tests measure a small volume of soil over a short time, and infiltration features clog and age. The LID Stormwater Management Guide divides the measured or calculated rate by a value between 2 and 3 before it is used in design, choosing the higher end for larger catchments, clayey soils, variable layers below the feature or nearby sensitive receptors.

Can grain size analysis replace field testing?

Grain size analysis can support field testing, and it is sometimes used for preliminary sizing. The guide treats grain size estimates, like double ring infiltrometer tests, as a reason to choose a more conservative safety factor than on-site permeameter or percolation tests.

At what depth are the tests done?

Infiltration tests are done at the proposed bottom elevation of each infiltration feature, and through the profile below it. Conditions within 1.5 m below the base matter, because a less permeable layer there limits how fast water can leave the feature.

Does groundwater depth matter if the soil is sandy?

Groundwater depth matters even in sandy soil: a feature that sits in groundwater for part of the year will not drain. Where LID features are proposed to meet a water balance target, LSRCA requires a scoped investigation of seasonal high groundwater levels as well as in-situ infiltration rates.

Can testing be done in winter?

Infiltration testing is not done in winter: frozen ground gives meaningless results, so testing waits for thaw. Plan it into the schedule early if the stormwater design depends on it.

How does infiltration testing differ from a water balance assessment?

Infiltration testing measures the design infiltration rate at each LID feature, mainly through field work, while a water balance assessment calculates the annual infiltration deficit for the whole site. The water balance sets the target; testing shows where and how fast the ground can take it.

What happens if infiltration testing is not done?

Without infiltration testing, a stormwater plan that relies on LID features has no measured rate behind it: the LID Stormwater Management Guide bases design rates on on-site testing. The Lake Simcoe Region Conservation Authority requires in-situ infiltration rates and seasonal high groundwater levels whenever LID features are proposed to mitigate a water balance deficit.

Sources

Get a typical cost range for your study

Pick a study type to open the full estimator. A licensed hydrogeologist confirms scope and pricing before any work starts.