Instant Hydrogeological Study Estimate
Choose a study type, answer two or three questions and see a typical cost range.
Estimate your study cost
- 11 study typesSeverances to dewatering and monitoring
- No obligationThe range is free; you decide whether to proceed
- Licensed professionalsStudies are completed by a P.Geo. or P.Eng.
How it works
- Pick the study, or tell the estimator what you are planning.
- Answer the questions about your site.
- Send your details to see the typical cost range. A licensed hydrogeologist serving your area then confirms the scope and price for your property.
Before you start
How is the range worked out?
Each study type starts from an indicative range based on a typical scope, and your answers adjust it, for example for site area, the number of lots or wells, or the depth of excavation. The result is rounded to the nearest $500. It excludes well drilling, government application fees and HST.
Is the estimate a quote?
No: it is an indicative range so you can budget and compare. The licensed hydrogeologist confirms the scope and price after reviewing your site, the municipality's requirements and any existing reports.
I do not know which study I need. Can I still use it?
Yes: choose "Not sure which study I need" and answer one question about what you are planning, such as severing a lot or building with a basement. The estimator picks the study that fits.
What happens after I send my details?
Your typical cost range appears in the form, and a licensed hydrogeologist serving your area contacts you shortly to confirm scope and pricing and answer your questions. There is no obligation to go ahead.